PPCGeeks Forums HTC Arrive HTC HD2 HTC Thunderbolt HTC Touch Pro 2 HTC Evo 4G HTC Evo 3D Samsung Galaxy S II Motorola Droid X Apple iPhone Blackberry
Go Back   PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro 2

Notices


 
 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #3 (permalink)  
Old 11-30-2009, 11:24 PM
KrisK91's Avatar
KrisK91
Guest
 
Posts: n/a
Mentioned: Post(s)
Tagged: Thread(s)
Re: How can I change the order of programs? (not sure what this is called)

Quote:
Originally Posted by Oxymoron238 View Post
If you tap the right softkey on the home tab, you should see a "remove quick links" or something like that. Tap that, and you can remove and replace the links that you put in those boxes.
wow thanks!
I coulndnt figure how do do this to save the life of me!

thank you once again!!
Reply With Quote
 

  PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro 2

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT -4. The time now is 06:11 AM.


Powered by vBulletin® ©2000 - 2025, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.6.0
©2012 - PPCGeeks.com