PPCGeeks Forums HTC Arrive HTC HD2 HTC Thunderbolt HTC Touch Pro 2 HTC Evo 4G HTC Evo 3D Samsung Galaxy S II Motorola Droid X Apple iPhone Blackberry
Go Back   PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro 2
Register Community Search

Notices


Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 11-30-2009, 08:15 PM
gtmethod3's Avatar
PPCGeeks Regular
Offline
Pocket PC: Touch Pro 2
Carrier: Sprint
Location: Chicago, IL
 
Join Date: Nov 2008
Posts: 145
Reputation: 220
gtmethod3 is keeping up the good workgtmethod3 is keeping up the good workgtmethod3 is keeping up the good work
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Question SMS Spacing

I have noticed in WinMo 6.5 there is a lot more spacing when viewing all messages in outlook. This is probably to be more finger friendly, but I would rather see more on the screen at a time.

Are there any solutions to revert back to seeing more items on screen?



On a side note, I am on a quest to find the best SMS messaging client. So far:

1. WinMo - works, just old, not fancy looking, no thrills, spacing too much
2. HTC Messenger - Looks nice, too slow to be useful, landscape switching annoying.
3. SMS Chat - Checking it out now, seems worthwhile, not the most eye friendly, trouble getting it default client

Any thoughts on SMS clients is greatly appreciated. I'm looking for something that works well, yet looks nice.
Reply With Quote
  #2 (permalink)  
Old 11-30-2009, 08:30 PM
WhiteBlazer01's Avatar
AWESOME VIP Member!!
Offline
Pocket PC: HTC Touch Pro 2 - SIM & HSPL unlocked
Carrier: Verizon
Location: So Cal
 
Join Date: Feb 2007
Posts: 1,531
Reputation: 975
WhiteBlazer01 knows their stuffWhiteBlazer01 knows their stuffWhiteBlazer01 knows their stuffWhiteBlazer01 knows their stuffWhiteBlazer01 knows their stuffWhiteBlazer01 knows their stuffWhiteBlazer01 knows their stuffWhiteBlazer01 knows their stuff
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Re: SMS Spacing

On your side note, try a new rom. I was on the Oct 22 Energyrom, and the HTC sms client was slow and laggy. I'm now on the Nov 25 Energy rom, and it's much faster, has all the old functions back (click on links/phone numbers, character counter, etc...). Not buggy like before. Only problem is no mms, but you said sms.
__________________
Reply With Quote
  #3 (permalink)  
Old 11-30-2009, 11:12 PM
gtmethod3's Avatar
PPCGeeks Regular
Offline
Pocket PC: Touch Pro 2
Carrier: Sprint
Threadstarter
Location: Chicago, IL
 
Join Date: Nov 2008
Posts: 145
Reputation: 220
gtmethod3 is keeping up the good workgtmethod3 is keeping up the good workgtmethod3 is keeping up the good work
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Re: SMS Spacing

I'm on the 28005 build and it is still very laggy when loading up a handful of messages in a thread. Perhaps I am doing something wrong?
Reply With Quote
  #4 (permalink)  
Old 11-30-2009, 11:51 PM
gtmethod3's Avatar
PPCGeeks Regular
Offline
Pocket PC: Touch Pro 2
Carrier: Sprint
Threadstarter
Location: Chicago, IL
 
Join Date: Nov 2008
Posts: 145
Reputation: 220
gtmethod3 is keeping up the good workgtmethod3 is keeping up the good workgtmethod3 is keeping up the good work
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Re: SMS Spacing

I've been searching far and wide, and I can't seem to find a cure. I feel like it should be a simple registry hack to change the spacing.

Help anyone?
Reply With Quote
Reply

  PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro 2


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT -4. The time now is 05:22 PM.


Powered by vBulletin® ©2000 - 2025, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.6.0
©2012 - PPCGeeks.com