PPCGeeks Forums HTC Arrive HTC HD2 HTC Thunderbolt HTC Touch Pro 2 HTC Evo 4G HTC Evo 3D Samsung Galaxy S II Motorola Droid X Apple iPhone Blackberry
Go Back   PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro 2
Register Community Search

Notices


Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 11-30-2009, 10:07 PM
KrisK91's Avatar
KrisK91
Guest
 
Posts: n/a
Mentioned: Post(s)
Tagged: Thread(s)
How can I change the order of programs? (not sure what this is called)

Is there a way to change the nine boxes that you can add a program, bookmark, or contact to. Im not sure what it is called but it is on Juicys R5 Rom. Its on the home screen.

thanks!
Reply With Quote
  #2 (permalink)  
Old 11-30-2009, 10:27 PM
Oxymoron238's Avatar
Halfway to VIP Status
Offline
Pocket PC: HTC Trophy
Carrier: Verizon
Location: The left wing of one of Garmin's GPS Satellites
 
Join Date: Jun 2008
Posts: 526
Reputation: 1150
Oxymoron238 is halfway to VIP status based on repOxymoron238 is halfway to VIP status based on repOxymoron238 is halfway to VIP status based on repOxymoron238 is halfway to VIP status based on repOxymoron238 is halfway to VIP status based on repOxymoron238 is halfway to VIP status based on repOxymoron238 is halfway to VIP status based on repOxymoron238 is halfway to VIP status based on repOxymoron238 is halfway to VIP status based on rep
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Re: How can I change the order of programs? (not sure what this is called)

If you tap the right softkey on the home tab, you should see a "remove quick links" or something like that. Tap that, and you can remove and replace the links that you put in those boxes.
__________________
Got Windows Phone 7. Love Windows Phone 7.
Reply With Quote
  #3 (permalink)  
Old 11-30-2009, 10:28 PM
kevmo1965's Avatar
Halfway to VIP Status
Offline
Pocket PC: EVO 4G
Carrier: Sprint EVRP
Location: Victorville, CA
 
Join Date: Jul 2007
Posts: 531
Reputation: 730
kevmo1965 knows their stuffkevmo1965 knows their stuffkevmo1965 knows their stuffkevmo1965 knows their stuffkevmo1965 knows their stuffkevmo1965 knows their stuffkevmo1965 knows their stuff
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Send a message via MSN to kevmo1965
Re: How can I change the order of programs? (not sure what this is called)

nevermind!
__________________
Hit THANKS if I helped or made ya laugh!


Reply With Quote
  #4 (permalink)  
Old 11-30-2009, 11:24 PM
KrisK91's Avatar
KrisK91
Guest
 
Posts: n/a
Mentioned: Post(s)
Tagged: Thread(s)
Re: How can I change the order of programs? (not sure what this is called)

Quote:
Originally Posted by Oxymoron238 View Post
If you tap the right softkey on the home tab, you should see a "remove quick links" or something like that. Tap that, and you can remove and replace the links that you put in those boxes.
wow thanks!
I coulndnt figure how do do this to save the life of me!

thank you once again!!
Reply With Quote
Reply

  PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro 2


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT -4. The time now is 08:40 AM.


Powered by vBulletin® ©2000 - 2025, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.6.0
©2012 - PPCGeeks.com