View Single Post
  #2 (permalink)  
Old 03-04-2008, 03:18 PM
wldthng842's Avatar
wldthng842
Lab Rat
Offline
Location: Overland Park, KS
 
Join Date: Jan 2008
Posts: 1,132
Reputation: 58
wldthng842 is becoming a great contributor
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Send a message via AIM to wldthng842
Re: Overloading your calendar?

There should be a setting in the active syns to only add events back so far. I know there was when using active sync with exchange at work. You might try lowering in down. I think it is available from the options within active sync on the phone. I think the max is 2 weeks, but you can try lower.
__________________
I work for Sprint, I don't speak for them. Moderator PhoneNews.com (Brandon Smith)

Remember to say when someone helps you out.

Open thread without searching > waste server usage > waste energy > higher gas prices
Think about the economy the next time you feel the need to open a useless thread. Think about it.