PPCGeeks Forums HTC Arrive HTC HD2 HTC Thunderbolt HTC Touch Pro 2 HTC Evo 4G HTC Evo 3D Samsung Galaxy S II Motorola Droid X Apple iPhone Blackberry
Go Back   PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro
Register Community Search

Notices


Reply
 
LinkBack Thread Tools
  #1 (permalink)  
Old 11-21-2008, 11:52 PM
Warlocklord's Avatar
PPCGeeks Regular
Offline
Pocket PC: EVO
Carrier: Verizon
 
Join Date: Oct 2007
Posts: 69
Reputation: 25
Warlocklord is just getting started
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Fixing TF3D Landscape

Is it possible to fix the broken landscape tf3d after installing a theme? If I open it after installing the vista theme, the screen garbles.
Reply With Quote
  #2 (permalink)  
Old 11-22-2008, 12:10 AM
darren.wlsn1's Avatar
acs tester
Offline
Pocket PC: diamond/tp1/tp2/MoFo/touch 4g
Carrier: ppcgeeks/sprint
Location: pa
 
Join Date: May 2008
Posts: 24,870
Reputation: 51195
darren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation level
Mentioned: 14 Post(s)
Tagged: 0 Thread(s)
Send a message via AIM to darren.wlsn1 Send a message via MSN to darren.wlsn1 Send a message via Yahoo to darren.wlsn1 Send a message via Skype™ to darren.wlsn1
Re: Fixing TF3D Landscape

thats because some themes are for the diamond and they hang on the pro. get another theme. did you get it here?http://www.thetouchblog.com/TF3D/main.html

Last edited by darren.wlsn1; 11-22-2008 at 12:13 AM.
Reply With Quote
  #3 (permalink)  
Old 11-22-2008, 12:18 AM
Warlocklord's Avatar
PPCGeeks Regular
Offline
Pocket PC: EVO
Carrier: Verizon
Threadstarter
 
Join Date: Oct 2007
Posts: 69
Reputation: 25
Warlocklord is just getting started
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Re: Fixing TF3D Landscape

Quote:
Originally Posted by darren.wlsn1 View Post
thats because some themes are for the diamond and they hang on the pro. get another theme. did you get it here?http://www.thetouchblog.com/TF3D/main.html


I did get it from there. Is there a theme similar to the Vista theme on that site for the touch pro?
Reply With Quote
  #4 (permalink)  
Old 11-22-2008, 12:27 AM
darren.wlsn1's Avatar
acs tester
Offline
Pocket PC: diamond/tp1/tp2/MoFo/touch 4g
Carrier: ppcgeeks/sprint
Location: pa
 
Join Date: May 2008
Posts: 24,870
Reputation: 51195
darren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation level
Mentioned: 14 Post(s)
Tagged: 0 Thread(s)
Send a message via AIM to darren.wlsn1 Send a message via MSN to darren.wlsn1 Send a message via Yahoo to darren.wlsn1 Send a message via Skype™ to darren.wlsn1
Re: Fixing TF3D Landscape

post#1 and #3 have good themes. in post 3, the themes are in his sig. http://forum.xda-developers.com/showthread.php?t=418963
Reply With Quote
  #5 (permalink)  
Old 11-22-2008, 12:31 AM
Warlocklord's Avatar
PPCGeeks Regular
Offline
Pocket PC: EVO
Carrier: Verizon
Threadstarter
 
Join Date: Oct 2007
Posts: 69
Reputation: 25
Warlocklord is just getting started
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Re: Fixing TF3D Landscape

Are these compatible with both the diamond and the touch pro? In his signature it mentions he is using the diamond so I just wanted to double check?
Reply With Quote
  #6 (permalink)  
Old 03-18-2009, 01:57 PM
Perasite's Avatar
Retired Staff
Offline
Pocket PC: HTC Touch Pro
Carrier: Sprint
Location: Yuma, AZ
 
Join Date: Sep 2006
Posts: 1,929
Reputation: 2026
Perasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIP
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Re: Fixing TF3D Landscape

I did not install a theme, but did install and then uninstall TouchLockPro and Gyrator2. Once I installed them, the Landscape TF3D is broken. If I slide my keyboard out, the TF3D rotates and gets garbled crap on the right side. I have checked the registry key at HKCU/Software/HTC/Manila/EnableLandscape and it is set to true. Anyone have any ideas on how to get the landscape buttons back? I'm using the stock Sprint ROM and have added a couple of tabs, but otherwise TF3D is default.
__________________
Now with VGA support on all software!

Projects: (PeraStats 1.7) (PeraCount with Clock 1.3) (PeraCount 1.3) (PeraProfiler 1.2) (S2U2Lock 1.1)
Reply With Quote
  #7 (permalink)  
Old 03-19-2009, 06:53 AM
darren.wlsn1's Avatar
acs tester
Offline
Pocket PC: diamond/tp1/tp2/MoFo/touch 4g
Carrier: ppcgeeks/sprint
Location: pa
 
Join Date: May 2008
Posts: 24,870
Reputation: 51195
darren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation leveldarren.wlsn1 can't get a higher reputation level
Mentioned: 14 Post(s)
Tagged: 0 Thread(s)
Send a message via AIM to darren.wlsn1 Send a message via MSN to darren.wlsn1 Send a message via Yahoo to darren.wlsn1 Send a message via Skype™ to darren.wlsn1
Re: Fixing TF3D Landscape

Quote:
Originally Posted by 6700Yuma View Post
I did not install a theme, but did install and then uninstall TouchLockPro and Gyrator2. Once I installed them, the Landscape TF3D is broken. If I slide my keyboard out, the TF3D rotates and gets garbled crap on the right side. I have checked the registry key at HKCU/Software/HTC/Manila/EnableLandscape and it is set to true. Anyone have any ideas on how to get the landscape buttons back? I'm using the stock Sprint ROM and have added a couple of tabs, but otherwise TF3D is default.
since the theme isnt hanging but sounds like same problem, use diamond tf3d config. and restore to default, may work and its better than a hardreset. ive fixed other problems this way with tf.
Reply With Quote
  #8 (permalink)  
Old 03-19-2009, 07:00 AM
GoodThings2Life's Avatar
Bringer of Good Things
Offline
Pocket PC: HTC TITAN
Carrier: AT&T
Location: Youngstown, OH
 
Join Date: Oct 2007
Posts: 2,121
Reputation: 10602
GoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation levelGoodThings2Life can't get a higher reputation level
Mentioned: 23 Post(s)
Tagged: 0 Thread(s)
Re: Fixing TF3D Landscape

Just one more quick thought... make sure you guys didn't enable any ClearType in Landscape tweaks.
__________________
--Someday, bringing GoodThings2Life will become a Paradigm!--
Reply With Quote
  #9 (permalink)  
Old 03-19-2009, 10:43 AM
Perasite's Avatar
Retired Staff
Offline
Pocket PC: HTC Touch Pro
Carrier: Sprint
Location: Yuma, AZ
 
Join Date: Sep 2006
Posts: 1,929
Reputation: 2026
Perasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIPPerasite is a VIP
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Re: Fixing TF3D Landscape

I found the problem, I had installed the new Nuekbbacklight cab that makes the light stay on when the keyboard is out. Unfortunately, I didn't realize it was the problem until I had hard reset and installed it a second time
Reply With Quote
Reply

  PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT -4. The time now is 02:36 PM.


Powered by vBulletin® ©2000 - 2026, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.6.0
©2012 - PPCGeeks.com