PPCGeeks Forums HTC Arrive HTC HD2 HTC Thunderbolt HTC Touch Pro 2 HTC Evo 4G HTC Evo 3D Samsung Galaxy S II Motorola Droid X Apple iPhone Blackberry
Go Back   PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro
Register Community Search

Notices


Reply
 
LinkBack Thread Tools
  #1 (permalink)  
Old 03-19-2009, 11:12 AM
Yankees368's Avatar
Regular 'Geeker
Offline
Pocket PC: Touch PRO
Carrier: Sprint
 
Join Date: Aug 2007
Posts: 255
Reputation: 85
Yankees368 is becoming a great contributor
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Advanced Config Assisted GPS disabled?

I was looking through Advanced Config today, and noticed that under the GPS header there is an option called "Assisted GPS" and was disabled already. It explains the option as "assisted GPS help the GPS to keep tracking position when entering areas with bad reception." Does flipping this to enabled have any real affect?
Reply With Quote
Reply

  PPCGeeks > Windows Mobile > WM HTC Devices > HTC Touch Pro


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT -4. The time now is 02:36 PM.


Powered by vBulletin® ©2000 - 2026, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.6.0
©2012 - PPCGeeks.com