View Single Post
  #427 (permalink)  
Old 01-13-2009, 03:17 PM
shad0w77's Avatar
shad0w77
Halfway to VIP Status
Offline
Location: New York
 
Join Date: Jun 2008
Posts: 618
Reputation: 480
shad0w77 is becoming a PPCGeeks regularshad0w77 is becoming a PPCGeeks regularshad0w77 is becoming a PPCGeeks regularshad0w77 is becoming a PPCGeeks regularshad0w77 is becoming a PPCGeeks regular
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Re: [1-11-09] eRice TP Kitchen v1.03.9c [SYS OS 5.2.21109 Build 21109.1.6.0] All Carr

Quote:
Originally Posted by electronicrice View Post
hmmm, i can't believe i didn't catch that before. I'll test out the switching of the OEM folders and rebuild. if everything is dandy, i'll reupload a new kitchen so others won't have to switch the folders
Before you upload, would it be possible to include the Touch Pro RUU and the PagePool changer? Maybe you can give the user an option (in the DOS prompt) to change the pagepool after building the nbh and before the RUU opens up. If the user says "yes", open the PP Changer, detect the close, and open the RUU. This way we dont have to cancel the RUU, open a separate PagePoolChanger, then go open the RUU again.

Just a thought...
Reply With Quote