View Single Post
  #180 (permalink)  
Old 12-19-2007, 05:44 AM
tiermann's Avatar
tiermann
VIP Member
Offline
Threadstarter
Location: PA, USA
 
Join Date: Apr 2007
Posts: 815
Reputation: 3165
tiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIPtiermann is still contributing even after becoming a VIP
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Send a message via AIM to tiermann Send a message via Yahoo to tiermann
Quote:
Originally Posted by spetrillo View Post
Could the OEMizer be tweaked to add Tasks as a sync option within the Mail2web/Exchange settings? Same goes for Notes?

Thanks,
Steve
You can't sync notes over exchange as far as I know.
Tasks will become visible as an option once you sync with a server that supports tasks. I'm not sure that it can be added in a provxml.
Reply With Quote